{"id":253,"date":"2019-09-15T18:03:59","date_gmt":"2019-09-15T16:03:59","guid":{"rendered":"http:\/\/www.dtenergietech.sk\/?p=253"},"modified":"2019-11-05T02:06:23","modified_gmt":"2019-11-05T01:06:23","slug":"komterm-energy-s-r-o-2018","status":"publish","type":"post","link":"https:\/\/www.dtenergietech.sk\/en\/2019\/09\/15\/komterm-energy-s-r-o-2018\/","title":{"rendered":"KOTOL\u0147A NA PLYN &#8211; 20 t\/h, \u010cesk\u00e1 republika"},"content":{"rendered":"\n<h3 style=\"text-align:left\" class=\"ref-title\"><strong>Dod\u00e1vka \u010dast\u00ed technol\u00f3gie, kompletiz\u00e1cia a celkov\u00e9 sprev\u00e1dzkovanie technol\u00f3gie plynovej kotolne A2 s celkov\u00fdm v\u00fdkonom plynov\u00fdch kotlov 20 t\/h v are\u00e1li IVECO<\/strong><\/h3>\n\n\n\n<hr class=\"wp-block-separator is-style-wide\"\/>\n\n\n\n<div class=\"wp-block-columns alignwide has-2-columns product-columns ref-columns\">\n<div class=\"wp-block-column\">\n<h2 style=\"text-align:left\" class=\"no-margin-top blue\"><strong>KOMTERM energy, s.r.o.<\/strong><br><strong>2018<\/strong><\/h2>\n\n\n\n<h4>Miesto realiz\u00e1cie<\/h4>\n\n\n\n<p style=\"font-size:15.5px\" class=\"has-text-color has-light-gray-color\"><strong>Are\u00e1l v\u00fdrobn\u00e9ho z\u00e1vodu IVECO<\/strong>, Vysok\u00e9 M\u00fdto (\u010cesk\u00e1 republika)<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" width=\"450\" height=\"350\" src=\"http:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_3-450x350.jpg\" alt=\"\" class=\"wp-image-911\"\/><\/figure>\n\n\n\n<h4>Technick\u00e9 \u00fadaje<\/h4>\n\n\n\n<table class=\"wp-block-table alignwide is-style-regular tech-table\"><tbody><tr><td>KOTOL<\/td><td>Parn\u00e9 kotly na s\u00fdtu paru (celkov\u00fd menovit\u00fd v\u00fdkon pary 20 t\/h (13,039 MW), Tlak 10 bar, <strong>kotol K1<\/strong> &#8211; 4,6 t\/h, <strong>Kotly K2,3<\/strong> &#8211; 2 x 7,7 t\/h<\/td><\/tr><tr><td>PALIVO<\/td><td>Plyn<\/td><\/tr><\/tbody><\/table>\n<\/div>\n\n\n\n<div class=\"wp-block-column\">\n<h4>Rozsah dod\u00e1vok a pr\u00e1c<\/h4>\n\n\n\n<ul class=\"ref-list\"><li><strong>Dod\u00e1vka a&nbsp;mont\u00e1\u017e<\/strong><ul><li>Technologick\u00e1 \u010das\u0165 (potrubie, z\u00e1vesy a POK, armat\u00fary, osadenie merania tepla v pare, kondenz\u00e1te, vody a elektro, n\u00e1tery, izol\u00e1cie)<\/li><li>Technologick\u00e1 \u010das\u0165 BOSCH (komplet\u00e1cia a dopojenie kotlovej \u010dasti, kompletiz\u00e1cia a dopojenie \u010derpadiel, NN a KN, Dopojenie ostatn\u00fdch \u010dast\u00ed diela)<\/li><\/ul><ul><li>VZT (Parn\u00e1 a elektrick\u00e1 jednotka, ventil\u00e1tory, protihlukov\u00e9 \u017eal\u00fazie, potrubie, izol\u00e1cie, armat\u00fary)<\/li><li>Elektro stavebn\u00e1 \u010das\u0165 (Osvetlenie, kabel\u00e1\u017e, z\u00e1suvky, \u017e\u013eaby, dopojenie na zemnenie, bleskozvod)<\/li><li>Elektro a MaR technol\u00f3gia (rozv\u00e1dza\u010de vr\u00e1tane vybavenia, kabelov\u00e9 trasy, meranie, pripojenie do rozv\u00e1dza\u010dov)<\/li><li>Preplachy <\/li><li>Sk\u00fa\u0161ky<\/li><li>Komplet\u00e1cia v\u0161etk\u00fdch dokladov<\/li><li>Technick\u00e1 dokument\u00e1cia<\/li><\/ul><\/li><\/ul>\n<\/div>\n<\/div>\n\n\n\n<ul class=\"wp-block-gallery columns-3 is-cropped\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"393\" height=\"698\" src=\"http:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VYsMyto_A2_1-e1569530162292-393x698.jpg\" alt=\"\" data-id=\"912\" data-link=\"http:\/\/www.dtenergietech.sk\/2019\/09\/15\/clanok-4\/ref_plyn_vysmyto_a2_1\/\" class=\"wp-image-912\" srcset=\"https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VYsMyto_A2_1-e1569530162292-393x698.jpg 393w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VYsMyto_A2_1-e1569530162292-169x300.jpg 169w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VYsMyto_A2_1-e1569530162292-768x1365.jpg 768w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VYsMyto_A2_1-e1569530162292.jpg 1152w\" sizes=\"(max-width: 393px) 100vw, 393px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"1046\" height=\"698\" src=\"http:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_2-1046x698.jpg\" alt=\"\" data-id=\"913\" data-link=\"http:\/\/www.dtenergietech.sk\/2019\/09\/15\/clanok-4\/ref_plyn_vysmyto_a2_2\/\" class=\"wp-image-913\" srcset=\"https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_2-1046x698.jpg 1046w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_2-300x200.jpg 300w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_2-768x513.jpg 768w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_2-1568x1046.jpg 1568w\" sizes=\"(max-width: 1046px) 100vw, 1046px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" width=\"1009\" height=\"698\" src=\"http:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_4-1009x698.jpg\" alt=\"\" data-id=\"914\" data-link=\"http:\/\/www.dtenergietech.sk\/2019\/09\/15\/clanok-4\/ref_plyn_vysmyto_a2_4\/\" class=\"wp-image-914\" srcset=\"https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_4-1009x698.jpg 1009w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_4-300x208.jpg 300w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_4-768x531.jpg 768w, https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_4-1568x1085.jpg 1568w\" sizes=\"(max-width: 1009px) 100vw, 1009px\" \/><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Dod\u00e1vka \u010dast\u00ed technol\u00f3gie, kompletiz\u00e1cia a celkov\u00e9 sprev\u00e1dzkovanie technol\u00f3gie plynovej kotolne A2 s celkov\u00fdm v\u00fdkonom plynov\u00fdch kotlov 20 t\/h v are\u00e1li IVECO KOMTERM energy, s.r.o.2018 Miesto realiz\u00e1cie Are\u00e1l v\u00fdrobn\u00e9ho z\u00e1vodu IVECO, Vysok\u00e9 M\u00fdto (\u010cesk\u00e1 republika) Technick\u00e9 \u00fadaje KOTOL Parn\u00e9 kotly na s\u00fdtu paru (celkov\u00fd menovit\u00fd v\u00fdkon pary 20 t\/h (13,039 MW), Tlak 10 bar, kotol K1 &hellip; <\/p>\n<p class=\"link-more\"><a href=\"https:\/\/www.dtenergietech.sk\/en\/2019\/09\/15\/komterm-energy-s-r-o-2018\/\" class=\"more-link\">Continue reading<span class=\"screen-reader-text\"> &#8220;KOTOL\u0147A NA PLYN &#8211; 20 t\/h, \u010cesk\u00e1 republika&#8221;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":910,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[4],"tags":[],"uagb_featured_image_src":{"full":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5.jpg",1472,983,false],"thumbnail":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5-450x350.jpg",450,350,true],"medium":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5-300x200.jpg",300,200,true],"medium_large":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5-768x513.jpg",640,428,true],"large":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5-1045x698.jpg",640,427,true],"1536x1536":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5.jpg",1472,983,false],"2048x2048":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5.jpg",1472,983,false],"post-thumbnail":["https:\/\/www.dtenergietech.sk\/wp-content\/uploads\/2019\/09\/Ref_Plyn_VysMyto_A2_5.jpg",1472,983,false]},"uagb_author_info":{"display_name":"datatherm-admin","author_link":"https:\/\/www.dtenergietech.sk\/en\/author\/datatherm-admin\/"},"uagb_comment_info":0,"uagb_excerpt":"Dod\u00e1vka \u010dast\u00ed technol\u00f3gie, kompletiz\u00e1cia a celkov\u00e9 sprev\u00e1dzkovanie technol\u00f3gie plynovej kotolne A2 s celkov\u00fdm v\u00fdkonom plynov\u00fdch kotlov 20 t\/h v are\u00e1li IVECO KOMTERM energy, s.r.o.2018 Miesto realiz\u00e1cie Are\u00e1l v\u00fdrobn\u00e9ho z\u00e1vodu IVECO, Vysok\u00e9 M\u00fdto (\u010cesk\u00e1 republika) Technick\u00e9 \u00fadaje KOTOL Parn\u00e9 kotly na s\u00fdtu paru (celkov\u00fd menovit\u00fd v\u00fdkon pary 20 t\/h (13,039 MW), Tlak 10 bar, kotol K1&hellip;","_links":{"self":[{"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/posts\/253"}],"collection":[{"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/comments?post=253"}],"version-history":[{"count":11,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/posts\/253\/revisions"}],"predecessor-version":[{"id":1120,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/posts\/253\/revisions\/1120"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/media\/910"}],"wp:attachment":[{"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/media?parent=253"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/categories?post=253"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.dtenergietech.sk\/en\/wp-json\/wp\/v2\/tags?post=253"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}